Site Measure Checklist for Glass and Wardrobes

Site Measure Checklist for Glass and Wardrobes

A site measure checklist keeps a custom glass or wardrobe project moving before anything is made. It gives the installer a clear view of the opening, the finished surfaces, access and the details that affect fit. For homeowners and builders, it also means fewer last-minute decisions once the job is ready to manufacture.

At Aurex Glass, every shower screen, sliding wardrobe door and mirror is made to suit the opening. The site measure is where the practical details are confirmed so the finished result sits cleanly, operates properly and suits the room.

What a site measure is for

A site measure is more than taking width and height measurements. The team checks the finished opening, the condition and position of surrounding surfaces, and the practical requirements for installation. This is particularly important with glass, as small variations in walls, floors and tiles can affect the final specification.

For a shower screen, the measure confirms the shower area, glass layout, door swing or fixed-panel position, and the hardware finish. For sliding wardrobe doors, it confirms the opening dimensions, floor and ceiling levels, side clearances, track placement and panel layout. Mirrors need the same level of care, including wall condition, edge positions and any cut-outs required around fixtures.

The outcome is a product specification based on the site as it stands, rather than an allowance made from a plan or an early measurement. That is the difference between a product that is selected for a room and one that is properly made to fit it.

Site measure checklist: before the appointment

The best site measures happen when the space is ready to assess. You do not need to prepare the job like a completed display home, but the opening and nearby work area should be accessible.

Use this checklist before the appointment:

  • Confirm the walls, floors and ceilings around the opening are complete, or advise what work is still pending.
  • Make sure tiles, waterproofing finishes, skirting, floor coverings and cabinetry that affect the opening are in their final position.
  • Clear access to the bathroom, bedroom, hallway or other installation area.
  • Have your preferred panel, frame, track or hardware finish in mind.
  • Keep plans, elevations or product inspiration available if they help explain the intended layout.
  • Let the team know about access limits, parking, stairs, lifts, body corporate requirements or site timing.
If another trade is still working in the area, say so early. Some projects can be measured before every detail is complete, while others need finished surfaces before final dimensions can be confirmed. It depends on what is being installed and which surfaces set the final opening.

Preparing for a shower screen measure

Bathroom projects often move quickly near the end, when tiling, tapware, cabinetry and painting are all being completed close together. The shower screen measure should happen at the point where the tiled shower area is finished and the screen can be set out accurately.

The team will look at the shower base or floor fall, wall alignment, tile joints, hob or channel detail and the available space around the entry. These details guide the glass size and layout. They also help determine whether a frameless or semi-frameless screen is the right choice for the bathroom.

Have a clear preference for the look you want, but stay open to practical advice on the final configuration. A fixed panel can suit one opening well, while another may need a different arrangement to make the most of available space. The right answer comes from the actual site dimensions, not a one-size layout.

It is also useful to choose hardware direction and finish before manufacture. Brushed Gold, Matt Black, Matt White, Brushed Nickel, Chrome and Gun Metal each create a different finish in the room. The best choice usually relates to the tapware, cabinetry handles and overall bathroom palette. A measured approach gives the space a resolved look without trying to make every detail identical.

Preparing for sliding wardrobe doors

Wardrobe openings can look square at a glance but rarely measure exactly the same at every point. Floors can rise or fall slightly, ceilings may vary, and walls can move away from each other across the opening. A professional measure records those differences so the doors and tracks are made for the space.

Before the appointment, make sure the wardrobe opening is accessible and permanent finishes are in place. This includes flooring where the bottom track will sit and ceiling finishes where the top track will be fixed. If carpet is planned but not yet laid, or if a new floor finish will change the height of the opening, raise it before the measure.

This is also the time to consider how the wardrobe needs to work day to day. Sliding doors are a clean option where room space is limited, but the panel arrangement affects which section of the wardrobe is available at any one time. The team can talk through the number of doors and panel widths based on the opening and the internal layout.

Aurex wardrobe doors are available in mirror, Super White glass, VJ primed, Gyprock vinyl and vinyl-backed panels. Frame and track finishes include Matt Black, White, Chrome, Brushed Gold and Matt Natural. Bring together the practical and visual decisions early: the panel material, frame finish and room colours should work as one considered selection.

What to confirm during the measure

A good site measure is a two-way conversation. The installer checks dimensions and installation conditions, while you confirm how you want the finished product to look and function. It is the right time to ask questions, rather than waiting until manufacture is underway.

For shower screens, confirm the preferred layout, entry position and hardware finish. For wardrobes, confirm panel type, frame and track finish, and how the doors will divide across the opening. For mirrors, confirm the final size, placement and whether nearby fittings affect the shape or edges.

If you are coordinating a renovation or build, make sure the person making the design decisions is involved where possible. A builder, interior trade or homeowner may each hold part of the information. Resolving it at the measure avoids delays caused by waiting on a finish selection or layout approval.

It also helps to be clear about the installation sequence. Glass and wardrobe doors are generally installed once surrounding work is complete enough to protect the finished product. Fresh painting, flooring, cabinetry adjustments or final tiling may influence the timing. The aim is a clean installation at the right stage, not simply the earliest available day.

Why final measurements matter

Online supply estimates and customer measurements are useful for planning a project. They provide a starting point and help narrow down product options. Final site measurements serve a different purpose: they set the dimensions used for manufacture and installation.

This matters because openings change during renovation work. New tiles add thickness. Flooring changes height. A wall that looked straight before lining or tiling can show a small variation once finished. These are normal site conditions, and they are exactly why an accurate measure is worth scheduling.

The process is straightforward. Choose the product direction and finish, book the measure, confirm the specification, then allow for manufacture and installation. Each step has a clear role. Getting the site details right first supports a better fit, cleaner lines and a result built to last.

After the site measure

Once the measure is complete, the project can move into final specification and manufacture. If a decision still needs to be made, such as a hardware finish or wardrobe panel selection, it is best to settle it promptly so the order can progress without unnecessary hold-ups.

Before installation, keep the access path clear and let the team know if site conditions have changed. New flooring, added cabinetry or alterations to the opening after the final measure may affect the planned fit and timing. A quick update gives the team the chance to assess the change before arriving on site.

For projects across Brisbane, the Gold Coast, Logan, Redlands, Ipswich, Tweed Heads and surrounding areas, a proper measure brings certainty to the final stage of the job. Set aside a little time, have your finishes ready and let the opening guide the specification. Your space will be easier to finish well when the details are confirmed from the start.